Pictures

Repaired Pop-up line under the pool floor
Good job done by Leak Squad

Broken return line repaired under the steps
Another good job done by Leak Squad
Found broken main water line 6 feet deep
Found cracks in the pool wall
Technicians looking for a broken infloor cleaning system line with the
ultrasonic listener
Found it later under the second step in the pool
Leak Sqaud technician repairing a broken pop-up PVC pipe under the pool
floor
Closer look at the break on the picture above
The break can be seen in the elbow right under the pop-up head
Broken Spa jet, succesfully repaired
Concrete patch after a repair
The cool deck is usually done 4-7 days later
Close-up look at a break in a 3" suction line

Leak Squad girls BBQ-ing in front of SCP (pool store)
Leak Squad diver installing the light after checking it for leaks

Three leaks found in the spa jets and in the auto fill line close together

After the concrete is complete - another good job done by Leak Squad

A bundle of pipes under the pavers
They were not layed exactly under 45 degrees and two of them broke
The bridges are build to make up for the bad angels

Vince is pressure testing the pipes on a new skimmer
We always make sure that we did not damage any pipes during demolition
|